Certification and Finished
Fat tyres on and ready for the certifier, then painted Voodoo Blue and finished.
-
Part 1
Ready for certification, fat tyres on
95% of the fabrication is done now and just waiting on certification so I can pull it all down and tidy everything up then paint it....
-
Part 2
2.5 litres of Honda power and the new front guard
2.5 litres of Honda 5 cylinder, fuel injected power hehe Think I might change that cross bar over the top of the engine yet, haven't made...
-
Part 3
Painted and finished
At long last the trike is 98% finished. The 2% left is small things like upholster the arm rest's and make engine cover and get it...